top of page

WIND

TURBINES

A smart alternative to all-concrete windmill support systems

GoliathTech has ingeniously adapted its helical piles for use in anchoring wind turbines. Stability and durability are essential, and GoliathTech’s helical piles are an anchoring solution designed to stabilize and support the windmill in any soil and under the most extreme weather conditions.

Helical piles are a better and easier solution than traditional all-concrete support systems. In the past, mounting block were made of concrete, requiring extensive dry time, excavation and cost. GoliathTech’s solution involves rotary installation of typically 30 to 50 helical piles deep into stable soil to act as anchors, followed by pouring of the windmill’s concrete base.

windmill-gros1-en.png

SUPERIOR TO ALL-CONCRETE SOLUTIONS INSTALLATION IN 1-2 WEEKS

  • Economical

  • Ecological (uses 1/3 amount of concrete)

  • Faster (all-concrete takes 3-4 months)

  • Fully engineered to resist movement & uplift

  • No weather delays

  • ISO 9001:2015 and ISO 14001:2015 Certified

  • ICC-ES ESR-3726 Certified

  • CWB / AWS D1.1 Certified

  • CCMC #13675-R Certified

  • ACQ and CA compliant

bottom of page